Menu

Hospital Interior Design and Build

TECO designs and fits out outpatient areas and clinical departments inside operating hospitals. Projects include the VIP outpatient area at Xuyen A Hospital, Cu Chi, and Saigon Children’s Hospital.

One contractor for design, joinery, MEP, fire protection and fire safety acceptance; work is zoned and scheduled so the clinical areas next door are not disrupted.

TECO’s capability in healthcare projects

  • Phased work in operating hospitals: one zone at a time, with dust and noise screening and material and worker routes kept apart from patient routes.
  • In-house joinery at our 1,300 m² workshop: reception counters, cabinets, partitions, doors and consulting room furniture.
  • Fire protection in the same package: TECO prepares the fire protection dossier, installs the system and completes fire safety acceptance.
  • Class II Construction Capability Certificate No. HCM-00062710.
  • After handover: scheduled maintenance of electrical, plumbing, air-conditioning and fire protection systems through TECO MSC.

Scope of the design & build package

Work itemTECO scope
DesignSurvey, layout of reception, consulting rooms, waiting areas and circulation, 3D renderings, technical drawings
Interiors, joineryReception counters, cabinets, partitions, doors, ceilings, flooring – easy-to-clean materials
MEPPower, lighting, air-conditioning, ventilation, water supply and drainage
Fire protectionDesign and installation; fire protection dossier and fire safety acceptance
MaintenanceScheduled maintenance and emergency repairs

Our 6-step process

  1. Survey – department functions, patient flow, existing condition
  2. Space planning – reception, consulting rooms, waiting areas, escape routes
  3. 3D design and technical drawings – materials, construction drawings, fire protection dossier
  4. Quotation and contract – detailed quantities, schedule, method statement for work inside the hospital
  5. Construction – zone by zone with screening; joinery made in the workshop in parallel
  6. Acceptance and handover – fire safety acceptance, handover, maintenance

Selected projects

Clients: Xuyen A General Hospital · Saigon Children’s Hospital.

Frequently asked questions

Can you work while the hospital is still treating patients?

Yes. TECO works zone by zone, screens off dust and noise, keeps material and worker routes away from patients, and schedules noisy work outside clinic hours.

Does TECO handle the fire protection dossier and fire safety acceptance?

Yes. TECO prepares the fire protection dossier, installs the system and completes fire safety acceptance.

What drives the cost?

Floor area, existing condition, material requirements, MEP and fire protection systems. TECO surveys the site and sends an itemised quotation.

Related services

Contact us for a consultation or site survey

TECO Construction and Architecture Joint Stock Company
Hotline / Zalo: +84 911 111 929 · Tel: +84 28 6659 6979 · Email: teco@tecoarch.com
Head office: 39 Nguyen Trung Ngan Street, Saigon Ward, Ho Chi Minh City · Office: No. 85, Street No. 19, Binh Trung Ward, Ho Chi Minh City