TECO designs and builds car showrooms, service workshops and retail shops to each brand’s identity standard. Projects include the VinFast 2S Sai Gon Moi service workshop (designed and built in 50 days and nights), MG Vung Tau showroom, Geely – Lynk & Co showroom and PNJ Vung Tau jewellery centre.
One contractor from construction, steel structure, interiors and MEP to fire protection, signage and the signage permit.
| Work item | TECO scope |
|---|---|
| Design | Survey, layout of display, sales and service areas, 3D renderings to the brand identity |
| Construction | Foundations, steel frame, roofing, workshop floor, facade |
| Interiors, joinery | Sales counters, cashier counter, display cabinets, partitions, ceilings, flooring |
| MEP | Power distribution, display lighting, air-conditioning, compressed air, water supply and drainage |
| Fire protection | Design and installation; fire protection dossier and fire safety acceptance |
| Signage | Signs, logos, pylons; signage permit application |
VinFast 2S service workshop
PNJ Vung Tau jewellery centreTECOMG Vung Tau car showroomTECOGeely – Lynk & Co car showroomClients: VinFast · MG · Geely – Lynk & Co · PNJ.
Yes. TECO works from the standards documents the brand provides and submits renderings and material samples for approval before construction.
It depends on size and structure; TECO fixes the schedule in the contract after the survey. For example, the 2,400 m² VinFast 2S service workshop was designed and built in 50 days and nights.
Yes. TECO prepares the fire protection dossier, completes fire safety acceptance and prepares the signage permit application.
TECO Construction and Architecture Joint Stock Company
Hotline / Zalo: +84 911 111 929 · Tel: +84 28 6659 6979 · Email: teco@tecoarch.com
Head office: 39 Nguyen Trung Ngan Street, Saigon Ward, Ho Chi Minh City · Office: No. 85, Street No. 19, Binh Trung Ward, Ho Chi Minh City