Menu

Restaurant and Cafe Design & Build

TECO designs and builds restaurants and cafes for F&B chains and premium brands in Ho Chi Minh City, the Southeast, the Mekong Delta and the Central Highlands. One contractor from site survey, design, joinery, kitchen MEP and fire safety to permits and maintenance after opening.

Design VND 150,000–350,000/m². Turnkey construction typically VND 4–10 million/m². 30–45 days per outlet.

Bar counter and seating inside Belgo restaurant
Bar counter and seating inside Belgo restaurant

Two client groups we serve

GroupWhat they needWhat TECO does
Restaurant chains, cafe chains, bakery chains, franchise systemsEvery outlet built to one brand standard; opening on the date agreed with the landlord; cost per outlet within budgetDesign the prototype outlet or build to the chain’s existing prototype; make matching joinery in our workshop; build several outlets in parallel; maintain the whole network
Premium restaurants and cafesReal materials, custom-made details, finishes that hold up at the distance a guest sitsTurnkey design and build, or build to drawings by the owner’s designer; material samples approved before production; mock-ups of complex details in the workshop on request
Belgo restaurant, District 3, Ho Chi Minh City, designed and built by TECO
Belgo restaurant, District 3, Ho Chi Minh City
Belgo restaurant facade and signage at night
Belgo restaurant facade and signage at night
Steel-framed glazing at the Belgo restaurant entrance
Steel-framed glazing at the Belgo restaurant entrance

Chain rollout: one standard for every outlet

  • A set of typical details. Counters, banquettes, partitions, ceilings, signage, material and colour codes are drawn once from the prototype outlet and stored as production files. Every outlet is cut from the same files on CNC machines, so sizes, colours and materials match.
  • Several outlets at once. Joinery is made centrally in our workshop; each outlet has its own crew and site manager. The owner deals with one TECO project lead and receives daily and weekly reports.
  • In shopping malls and buildings. TECO prepares the submission to building management, works at night and outside trading hours, moves materials on the service-lift schedule, connects power, water, kitchen exhaust and fire systems to the building’s systems and completes acceptance with management.
  • Shophouses and standalone premises. TECO surveys the structure and existing services, prepares the building permit or renovation registration when structure or use changes, installs the fire protection system and obtains the signage permit.
  • Holding the opening date. Each outlet’s date is fixed in the contract; TECO works overtime and weekends to keep it.
Belgo restaurant under construction with branded site hoarding
Belgo under construction: branded site hoarding

MEP, kitchen and fire safety

When an outlet opens late or needs rework after opening, the cause is usually behind the kitchen and above the ceiling, rarely the interior. TECO designs and installs these systems with its own engineers and crews, in the same drawing set as the interior.

SystemWhat TECO does
Power supplyCheck the premises’ supply capacity against the kitchen load before the owner signs the lease; dedicated kitchen distribution board, earth-leakage protection in wet areas, separate supply for cold rooms
Kitchen exhaust and fresh airHoods with grease filters, a dedicated exhaust duct with cleaning access, fans, odour treatment where needed; make-up air so smells do not reach the dining area. Exhaust rate not less than 27 m³/h per m² of kitchen floor, fresh-air intake at least 5 m from the kitchen exhaust outlet (TCVN 5687:2024)
Water, drainage, grease separationWaterproofed, non-slip kitchen floor falling to floor drains; grease traps and a grease interceptor before the main drain; hot water to wash-up areas
Gas or electric cookingBuilding rules checked at survey stage. For bottled gas: a separate cylinder store, fixed pipework, emergency shut-off valve, gas leak detectors interlocked with a solenoid valve
One-way kitchen flowReceiving, storage, prep, cooking and pass laid out in one direction; non-absorbent, easy-clean wall, floor and ceiling finishes. TECO provides the services ready for connection and coordinates with the owner’s kitchen equipment supplier
Lighting, air conditioning, low-voltageLayered lighting adjustable by time of day; air conditioning sized for peak covers and kitchen heat; data, CCTV, sound, point-of-sale

Fire-safety thresholds for restaurants and eateries in Vietnam

RequirementApplies whenBasis
Automatic fire alarmTotal floor area from 500 m². Buildings under 3 storeys and under 1,500 m² may use standalone detectorsQCVN 10:2025/BCA
Indoor fire hose reels6 storeys or more, or total floor area from 1,500 m²QCVN 10:2025/BCA
Automatic fire suppressionFire-safety height from 25 m, or total floor area from 5,000 m²QCVN 10:2025/BCA
Fire-safety design appraisalTotal floor area from 3,000 m², including renovation and change of useDecree 105/2025/NĐ-CP, Appendix III as replaced by Decree 347/2026/NĐ-CP
Compulsory fire and explosion insuranceTotal floor area from 300 m²Decree 105/2025/NĐ-CP, Appendix VII

An outlet inside a shopping mall follows the building’s own systems: TECO relocates detectors, sprinkler heads and hose reels to the new layout and completes acceptance with management. Escape routes and finishes follow QCVN 06:2022/BXD. See Fire protection installation, acceptance and maintenance.

TECO’s capability

  • In-house joinery and metalwork. A 1,300 m² CNC joinery workshop and a 1,200 m² steel workshop make bar counters, tables, banquettes, cabinets, partitions and metal frames; joinery carries a 24-month warranty. See Custom furniture workshop.
  • One company for every trade. Fit-out, MEP and fire-protection crews are TECO staff; architects, MEP engineers and fire-safety certified staff work on one drawing set.
  • Multi-site rollout experience. Branches and transaction offices for OCB and Vietbank, and Apollo English centres: one brand standard, many locations, fixed opening dates.
  • Used to demanding clients. Japanese companies, FDI businesses, banks and international schools.
  • Licensed. Class II construction capability certificate (HCM-00062710); TECO prepares building-management submissions, building permits, fire-safety and signage dossiers itself.

Rates and construction time

ItemTypical rangeNotes
DesignVND 150,000–350,000/m²Layout, 3D visuals, interior and MEP construction drawings
Turnkey constructionVND 4–10 million/m²Finishes, joinery, MEP, kitchen exhaust, fire safety; depends on the condition of the premises and finish level
Time30–45 days per outletOutlets in shopping malls also depend on building-management approval time

TECO surveys the premises and sends an itemised quotation free of charge.

Renovation and maintenance after opening

Renovating a trading outlet: TECO phases the work, builds at night and prefabricates joinery in the workshop to keep closure time as short as possible.

Network-wide maintenance: TECO MSC provides warranty service, scheduled maintenance and repairs for single outlets and whole chains, on call 24/7: electrical, air conditioning, plumbing, fire protection, joinery. TECO MSC maintains hundreds of facilities for OCB, Vietbank, Apollo English and international schools in southern Vietnam, and serviced 16 Apollo English centres in 30 days, working outside class hours. See TECO MSC – baotricongtrinh.com.

Our 6-step process

  1. Site survey – power, water and drainage, exhaust route, fire systems, building-management rules
  2. Design – layout, 3D visuals, construction drawings; for chains, the set of typical details
  3. Quotation and contract – itemised quantities, committed opening date
  4. Permits – building-management submission, permits, fire-safety dossier
  5. Production and construction – joinery made in the workshop while finishes and MEP proceed on site
  6. Acceptance and handover – commissioning of kitchen, exhaust and air conditioning; fire-safety acceptance; transfer to warranty and maintenance

Selected projects

Frequently asked questions

Does TECO build to a chain’s existing prototype design?

Yes. TECO prepares construction drawings for each site to the chain’s standard, then makes the joinery and builds to those drawings.

Does TECO build inside shopping malls?

Yes. TECO prepares the submission to building management, works at night and outside trading hours as required, connects power, water, exhaust and fire systems to the building’s systems and completes acceptance with management.

Does a restaurant in Vietnam need fire-safety design appraisal?

Restaurants and eateries with a total floor area from 3,000 m² require fire-safety design appraisal. Below that, fire equipment is still required according to size, for example an automatic fire alarm from 500 m² of total floor area.

Does TECO supply kitchen equipment?

TECO builds the kitchen shell and services: power, water and drainage, exhaust and gas. Kitchen equipment is supplied by the owner’s specialist; TECO coordinates drawings and installation timing.

How much does restaurant or cafe design and build cost?

Design VND 150,000–350,000/m². Turnkey construction typically VND 4–10 million/m², covering finishes, joinery, MEP, kitchen exhaust and fire safety. TECO sends an itemised quotation after surveying the premises.

How long does it take to build a restaurant or cafe?

Usually 30–45 days per outlet, depending on size and the condition of the premises. The opening date is fixed in the contract.

Related services

Contact us for a consultation or site survey

Send us your floor plan, prototype design or brand manual and TECO will prepare a proposal, quotation and programme. Free site survey and quotation.

TECO Construction and Architecture Joint Stock Company
Hotline / Zalo: +84 911 111 929 · Tel: +84 28 6659 6979 · Email: teco@tecoarch.com
Head office: 39 Nguyen Trung Ngan Street, Saigon Ward, Ho Chi Minh City · Representative office: No. 85, Street No. 19, Binh Trung Ward, Ho Chi Minh City