TECO designs and builds factories, plants, warehouses and factory office blocks in Ho Chi Minh City, Binh Duong, Dong Nai, Long An, Tay Ninh and Ba Ria – Vung Tau. Completed projects include SMC Long Duc 60,000 m², Intimex 40,000 m², Pocari Sweat 30,000 m², Fujiya 30,000 m², Megmilk 15,211 m², Dai Viet wood factory 12,500 m² and Showa Gloves 10,000 m².
The 2,400 m² VinFast 2S Sai Gon Moi service workshop was designed and built by TECO in 50 days and nights.
| Work item | TECO scope |
|---|---|
| Design | Architecture, pre-engineered steel and reinforced concrete structures, MEP, site infrastructure |
| Structure | Foundations, steel frame, roofing, cladding walls, factory floor slab |
| Finishing | Masonry and plastering, painting, flooring, ceilings, doors, office block fit-out |
| MEP | Power distribution, lighting, water supply and drainage, ventilation, office air-conditioning |
| Fire protection | Design and installation; fire protection dossier and fire safety acceptance |
| Permits | Building permit application; fire protection dossier and acceptance |
| Maintenance | Scheduled maintenance, roof leak repair, emergency repairs |
SMC Long Duc factory
Intimex factory
Pocari Sweat factory
Fujiya factory – Long An
Megmilk office and factory
Dai Viet wood manufacturing factory
Showa Gloves factory
Coen-Bio warehouse
VinFast 2S service workshopClients: VinFast · Fujiya · Showa Gloves · Megmilk · SMC · Pocari Sweat · Intimex · Obayashi. See all factory projects.
The 60,000 m² SMC Long Duc factory in Long Duc Industrial Park, Dong Nai, completed in 2023.
It depends on the function, loads, spans and schedule. Pre-engineered steel erects fast and spans wide; reinforced concrete suits heavy loads and multi-storey buildings. TECO works out the option after the survey, and fabricates steel in its own shop.
Yes. TECO prepares the fire protection dossier, installs the system and completes fire safety acceptance.
It depends on size and structure; TECO fixes the schedule in the contract after the survey. For example, the 2,400 m² VinFast 2S service workshop was designed and built in 50 days and nights.
Yes. TECO prepares the building permit application together with the fire protection dossier, so the owner does not need to hire another consultant.
TECO Construction and Architecture Joint Stock Company
Hotline / Zalo: +84 911 111 929 · Tel: +84 28 6659 6979 · Email: teco@tecoarch.com
Head office: 39 Nguyen Trung Ngan Street, Saigon Ward, Ho Chi Minh City · Office: No. 85, Street No. 19, Binh Trung Ward, Ho Chi Minh City