TECO designs and builds restaurants and cafes for F&B chains and premium brands in Ho Chi Minh City, the Southeast, the Mekong Delta and the Central Highlands. One contractor from site survey, design, joinery, kitchen MEP and fire safety to permits and maintenance after opening.
Design VND 150,000–350,000/m². Turnkey construction typically VND 4–10 million/m². 30–45 days per outlet.

| Group | What they need | What TECO does |
|---|---|---|
| Restaurant chains, cafe chains, bakery chains, franchise systems | Every outlet built to one brand standard; opening on the date agreed with the landlord; cost per outlet within budget | Design the prototype outlet or build to the chain’s existing prototype; make matching joinery in our workshop; build several outlets in parallel; maintain the whole network |
| Premium restaurants and cafes | Real materials, custom-made details, finishes that hold up at the distance a guest sits | Turnkey design and build, or build to drawings by the owner’s designer; material samples approved before production; mock-ups of complex details in the workshop on request |




When an outlet opens late or needs rework after opening, the cause is usually behind the kitchen and above the ceiling, rarely the interior. TECO designs and installs these systems with its own engineers and crews, in the same drawing set as the interior.
| System | What TECO does |
|---|---|
| Power supply | Check the premises’ supply capacity against the kitchen load before the owner signs the lease; dedicated kitchen distribution board, earth-leakage protection in wet areas, separate supply for cold rooms |
| Kitchen exhaust and fresh air | Hoods with grease filters, a dedicated exhaust duct with cleaning access, fans, odour treatment where needed; make-up air so smells do not reach the dining area. Exhaust rate not less than 27 m³/h per m² of kitchen floor, fresh-air intake at least 5 m from the kitchen exhaust outlet (TCVN 5687:2024) |
| Water, drainage, grease separation | Waterproofed, non-slip kitchen floor falling to floor drains; grease traps and a grease interceptor before the main drain; hot water to wash-up areas |
| Gas or electric cooking | Building rules checked at survey stage. For bottled gas: a separate cylinder store, fixed pipework, emergency shut-off valve, gas leak detectors interlocked with a solenoid valve |
| One-way kitchen flow | Receiving, storage, prep, cooking and pass laid out in one direction; non-absorbent, easy-clean wall, floor and ceiling finishes. TECO provides the services ready for connection and coordinates with the owner’s kitchen equipment supplier |
| Lighting, air conditioning, low-voltage | Layered lighting adjustable by time of day; air conditioning sized for peak covers and kitchen heat; data, CCTV, sound, point-of-sale |
| Requirement | Applies when | Basis |
|---|---|---|
| Automatic fire alarm | Total floor area from 500 m². Buildings under 3 storeys and under 1,500 m² may use standalone detectors | QCVN 10:2025/BCA |
| Indoor fire hose reels | 6 storeys or more, or total floor area from 1,500 m² | QCVN 10:2025/BCA |
| Automatic fire suppression | Fire-safety height from 25 m, or total floor area from 5,000 m² | QCVN 10:2025/BCA |
| Fire-safety design appraisal | Total floor area from 3,000 m², including renovation and change of use | Decree 105/2025/NĐ-CP, Appendix III as replaced by Decree 347/2026/NĐ-CP |
| Compulsory fire and explosion insurance | Total floor area from 300 m² | Decree 105/2025/NĐ-CP, Appendix VII |
An outlet inside a shopping mall follows the building’s own systems: TECO relocates detectors, sprinkler heads and hose reels to the new layout and completes acceptance with management. Escape routes and finishes follow QCVN 06:2022/BXD. See Fire protection installation, acceptance and maintenance.
| Item | Typical range | Notes |
|---|---|---|
| Design | VND 150,000–350,000/m² | Layout, 3D visuals, interior and MEP construction drawings |
| Turnkey construction | VND 4–10 million/m² | Finishes, joinery, MEP, kitchen exhaust, fire safety; depends on the condition of the premises and finish level |
| Time | 30–45 days per outlet | Outlets in shopping malls also depend on building-management approval time |
TECO surveys the premises and sends an itemised quotation free of charge.
Renovating a trading outlet: TECO phases the work, builds at night and prefabricates joinery in the workshop to keep closure time as short as possible.
Network-wide maintenance: TECO MSC provides warranty service, scheduled maintenance and repairs for single outlets and whole chains, on call 24/7: electrical, air conditioning, plumbing, fire protection, joinery. TECO MSC maintains hundreds of facilities for OCB, Vietbank, Apollo English and international schools in southern Vietnam, and serviced 16 Apollo English centres in 30 days, working outside class hours. See TECO MSC – baotricongtrinh.com.
Yes. TECO prepares construction drawings for each site to the chain’s standard, then makes the joinery and builds to those drawings.
Yes. TECO prepares the submission to building management, works at night and outside trading hours as required, connects power, water, exhaust and fire systems to the building’s systems and completes acceptance with management.
Restaurants and eateries with a total floor area from 3,000 m² require fire-safety design appraisal. Below that, fire equipment is still required according to size, for example an automatic fire alarm from 500 m² of total floor area.
TECO builds the kitchen shell and services: power, water and drainage, exhaust and gas. Kitchen equipment is supplied by the owner’s specialist; TECO coordinates drawings and installation timing.
Design VND 150,000–350,000/m². Turnkey construction typically VND 4–10 million/m², covering finishes, joinery, MEP, kitchen exhaust and fire safety. TECO sends an itemised quotation after surveying the premises.
Usually 30–45 days per outlet, depending on size and the condition of the premises. The opening date is fixed in the contract.
Send us your floor plan, prototype design or brand manual and TECO will prepare a proposal, quotation and programme. Free site survey and quotation.
TECO Construction and Architecture Joint Stock Company
Hotline / Zalo: +84 911 111 929 · Tel: +84 28 6659 6979 · Email: teco@tecoarch.com
Head office: 39 Nguyen Trung Ngan Street, Saigon Ward, Ho Chi Minh City · Representative office: No. 85, Street No. 19, Binh Trung Ward, Ho Chi Minh City